Estimating Line Output
Estimating painting line output is straightforward: work out the spraying time each part needs, then calculate with your daily production hours.
The formula
Daily output = daily production hours / spraying time per part
When a tray or fixture holds several parts, time per part = time per tray / parts per tray.
What drives time per part
- Part size and shape: curved surfaces, interiors and multi-side spraying need longer paths
- Number of coats: primer and topcoat in separate passes, plus flash-off time
- Curing: oven length and conveyor speed must match the paint's curing time
- Loading method: manual or automatic loading and unloading
Common ways to raise output
- Dual-station machines that spray two trays at once, such as HD-380-8S-PC
- Index machines with continuous loading, such as the HD-200 eight-index machine
- Moving to a full line once volumes grow, see Single Machine or Full Line
Tell us the part, number of coats and target daily output, and we will estimate a configuration.
Send your data